↓

iCompute.com

Secure, individual services for a connected world

iCompute.com
Home Menu ↓
Skip to primary content
Skip to secondary content
  • home
  • Services
  • About iCompute
  • Contact
  • Status
  • Support
Home→Categories Facility Events - Page 7 << 1 2 … 5 6 7 8 9 … 14 15 >>

Post navigation

← Older posts
Newer posts →

10/13 – upstream outage

Posted on October 13, 2019 by System AdminSeptember 18, 2021

At 4:47 PM CDT, 10/13, our upstream connection failed. At 5:31 PM CDT, 10/13, connectivity was restored. We apologize for the interruption in service. … Continue reading →

Posted in Facility Events | Tagged power, upstream

09/18 – Web server crashed

Posted on September 21, 2019 by System AdminSeptember 21, 2019

At 11:21 PM CDT, our web server smile crashed. It was restored to service at 11:45 PM CDT. No data should be lost. We apologize for the interruption in service. … Continue reading →

Posted in Facility Events

09/08 – upstream interruption and power loss

Posted on September 8, 2019 by System AdminSeptember 18, 2021

Today at 7:15 AM CDT, our upstream connection failed, about the same time as local electrical power was lost. (The computers did not lose power, as they are protected by UPS backup power) At 8:34 AM CDT upstream connectivity and power … Continue reading →

Posted in Facility Events | Tagged power, upstream

08/20 – upstream interruption and power loss again (updated)

Posted on August 20, 2019 by System AdminSeptember 18, 2021

Today at 10:22 PM CDT, our upstream connection failed, about the same time as local electrical power was lost. (The computers did not lose power, as they are protected by UPS backup power) At 12:12 PM CDT upstream connectivity and power … Continue reading →

Posted in Facility Events | Tagged power, upstream

08/02 – upstream interruption and power loss

Posted on August 2, 2019 by System AdminSeptember 18, 2021

Today at 12:05 PM CDT, our upstream connection failed, about the same time as local electrical power was lost. (The computers did not lose power, as they are protected by UPS backup power) At 2:19 PM CDT upstream connectivity and power were … Continue reading →

Posted in Facility Events | Tagged power, upstream

07/02 – upstream interruption and power loss (updated)

Posted on July 2, 2019 by System AdminSeptember 18, 2021

This evening at 11:32 PM CDT, our upstream connection failed, about the same time as local electrical power was lost. (The computers did not lose power, as they are protected by UPS) About 4:00 AM CDT the mercy server was shut down … Continue reading →

Posted in Facility Events | Tagged power, upstream

05/07 – mercy crashed

Posted on May 7, 2019 by System AdminMay 7, 2019

The server mercy crashed this evening at about 8:11 PM CDT. It was restored to service by 8:42 PM CDT. We apologize for the interruption in service. … Continue reading →

Posted in Facility Events | Tagged crash

03/25 – upgrade to php-7.x soon

Posted on March 25, 2019 by System AdminMarch 25, 2019

At iCompute, we support web sites running WordPress, Joomla! and others based on php. We re currently running php 5.6.40, and it’s time to move up to a more modern, better supported, current version. The plan is to upgrade to … Continue reading →

Posted in Facility Events | Tagged php, upgrade

01/11 – Scheduled interruption in service on 01/19 – success

Posted on January 22, 2019 by System AdminJanuary 22, 2019

The scheduled maintenance on Saturday morning January 19th, 2019 between 6 and 9 AM CST was successful. Our main web server was upgraded to NetBSD 7.2. Disruption in service was minimal. Smile was unavailable from about 6:50 AM CST and … Continue reading →

Posted in Facility Events | Tagged system time, upgrade

01/11 – Upcoming interruption in service on 01/19

Posted on January 11, 2019 by System AdminJanuary 22, 2019

We are upgrading our main web server on Saturday morning January 19th between 6 and 9 AM CST. Every effort will be made to keep any service interruption(s) short, but the main web server (smile) will be unavailable for some … Continue reading →

Posted in Facility Events | Tagged system time, upgrade

Post navigation

← Older posts
Newer posts →

Recent posts

  • 7/19 – Planned upgrades July 19th @5 AM
  • 06/18 – Brief upstream failure
  • 04/17 – 35 minute upstream failure
  • 4/5/2025 – Downtime Success
  • 01/03/2025 – Web server attack slows access

Archives

Admin Login

  • Log in
© 2025 - iCompute.com Proudly powered by WordPress  Weaver II by WP Weaver
↑